Skip to main content
 
 
Contact Us
My Account
Load Control
Home
Menu
  • Home
  • About Us
    • Bylaws
    • Contact Us
    • Cooperative Principles
    • Frequently Asked Questions
    • History
    • Job Opportunities
    • Rules and Regs
    • Service Area
    • Why We Plan Outages
    • About Touchstone Energy
  • Board of Directors
    • Annual Meeting
      • Annual Meeting Minutes
      • Balance Sheet and Record of Growth
      • Board of Directors Election
      • Voting and Election Policy
    • Board of Directors
    • Board Meetings
  • Member Services
    • Rebate Program
    • Acre Feet Calculator
    • Bank Draft Form
    • Billing Procedures
    • ChooseEV
    • Energy Efficiency
      • Energy Audits
      • Energy Saving Tips
    • HEA Rates
      • Irrigation Rates
      • Large Commercial and Industrial Rates
      • Residential Rates
      • Small Commercial Rates
    • Oversized Loads
    • Products
      • Electrical Thermal Storage
      • LED Yard Light
      • Marathon Water Heaters
      • Surge Protectors
    • Renewable Energy
      • Library of Documents
      • Green Power
      • Net Metering Schedule
    • Touchstone Energy Savings
  • Community
    • Co-op Connections
    • Co-op Links
    • Colorado Country Life
    • Dolly Parton's Imagination Library
    • Loan Assistance
      • Rural Energy Savings Program (RESP)
    • Need Project Conference
    • Safety
      • Safety Quiz
    • Support Local Businesses
    • Youth
      • Scholarships
      • Youth Leadership Camp
      • Washington DC Youth Tour
  • Solar Generation
  • Outage Map

Small Commercial Rates

You are here

  1. Member Services
  2. HEA Rates
  3. Small Commercial Rates

Applicable commercial consumers, small industrial consumers and three-phase farm consumers for all usage, subject to the conditions of service and the established rules and regulations of the Association. Service under this schedule is limited to consumers whose load requirement is less than 50 kva of transformer capacity.

Service Charge

Single Phase

3 Phase

Per meter per month

$32.50

$42.50

 

 

 

Combined Demand & Energy Charge (Jan. - Dec.)

 

 

First 1600 kWh/month

$0.0982

$0.0982

All additional kWh/month

$0.0838

$0.0838

Back to Top

Holyoke Office

1300 S Interocean

Holyoke, CO 80734

970-854-2236

Sterling Office

16107 Hwy 14

Sterling, CO 80751

970-522-2650

Ovid Office

100 Main Street

Ovid, CO 80744

970-463-5440

Follow Us Online


HOLYOKE OFFICE: 970.854.2236

TOLL FREE: 800.816.2236

EMPLOYEES ONLY

©2021 Highline Electric Association. All Rights Reserved.

  • Home
  • About Us
    • Bylaws
    • Contact Us
    • Cooperative Principles
    • Frequently Asked Questions
    • History
    • Job Opportunities
    • Rules and Regs
    • Service Area
    • Why We Plan Outages
    • About Touchstone Energy
  • Board of Directors
    • Annual Meeting
      • Annual Meeting Minutes
      • Balance Sheet and Record of Growth
      • Board of Directors Election
      • Voting and Election Policy
    • Board of Directors
    • Board Meetings
  • Member Services
    • Rebate Program
    • Acre Feet Calculator
    • Bank Draft Form
    • Billing Procedures
    • ChooseEV
    • Energy Efficiency
      • Energy Audits
      • Energy Saving Tips
    • HEA Rates
      • Irrigation Rates
      • Large Commercial and Industrial Rates
      • Residential Rates
      • Small Commercial Rates
    • Oversized Loads
    • Products
      • Electrical Thermal Storage
      • LED Yard Light
      • Marathon Water Heaters
      • Surge Protectors
    • Renewable Energy
      • Library of Documents
      • Green Power
      • Net Metering Schedule
    • Touchstone Energy Savings
  • Community
    • Co-op Connections
    • Co-op Links
    • Colorado Country Life
    • Dolly Parton's Imagination Library
    • Loan Assistance
      • Rural Energy Savings Program (RESP)
    • Need Project Conference
    • Safety
      • Safety Quiz
    • Support Local Businesses
    • Youth
      • Scholarships
      • Youth Leadership Camp
      • Washington DC Youth Tour
  • Solar Generation
  • Outage Map